Before you complete
Pre-Completion Inspection
The full inspection before you sign, so the developer fixes defects before you move in, not after.

Independent new-build snagging inspections. We don't work for the developer. We work for you.
A new build should be the one house you never have to worry about. Yet every week, buyers move into brand-new homes and find damp, cracked plaster, rushed finishes and cheap materials, with a developer who is suddenly hard to reach.
That’s why we started New House Inspections. Rich builds these houses. He’s a qualified electrician who works on new-build sites every week, and he sees what gets signed off and what gets missed.
We go through your home room by room, document every defect, and give you a clear report the builder has to answer to.
Most snagging companies get their work through developer referrals. Ours comes from buyers. That changes what goes in the report.
We're not on anyone's recommended list and we don't want to be. Nobody at the sales office sends us work.
If it's wrong, it goes in the report. We don't soften findings to keep a site manager happy.
You pay us, you get the report, you decide what to do with it. The developer never sees it unless you send it.
Most buyers book a pre-completion inspection. If you have already moved in, the snagging inspection covers the same ground inside the two-year defects period.
Before you complete
The full inspection before you sign, so the developer fixes defects before you move in, not after.
After you move in
The same room-by-room inspection for homes already occupied, inside the two-year defects period.
When the builder says it is done
We come back and check every item on the original list was actually put right. We don't chase the builder. We check the builder.
Add to any inspection
Consumer unit, circuits, socket positions, bonding and RCD tests, checked by a qualified electrician.
Four steps. You can be there for the inspection or leave it to us.
Tell us the plot, the developer and when you complete. We arrange access with the site, using our CSCS cards if the home is not yet handed over.
At least two hours on site, room by room, inside and out. Every defect is photographed, measured where it matters, and logged.
Within 48 hours: a clear, numbered PDF with photos, locations and what the standard requires. Written so a site manager cannot argue with it.
You hand the report to the developer. When they tell you the work is done, book a re-inspection and we check it really is.
Where our job ends. Getting defects fixed is between you and your developer, and we don’t act as your agent in that. What we do is give you evidence they can’t wave away, and come back to check the fixes when you ask us to.
Real defects from real inspections. Most of these had already been 'snagged' by the developer's recommended inspector.
Kitchen
Worktop joint open, grout cracked along the splashback
Missed by the developer’s snagger
Loft
Insulation missing over the bathroom and pushed back from the eaves
Missed by the developer’s snagger
Bedroom 2
Sockets 40mm below plan height, faceplates out of level
Missed by the developer’s snagger
Exterior
Weep holes blocked with mortar above the patio door
Bathroom
Bath panel unsealed, waste trap weeping into the void
Missed by the developer’s snagger
Garage
Fire door to garage: intumescent strip missing from the frame, closer not adjusted
One price for the inspection, one for the follow-up, nothing hidden. Prices cover homes up to four bedrooms; larger homes are quoted.
£500
Pre-completion or after you move in
The full room-by-room inspection, inside and out.
£400
Only if you need it
When the builder says the snags are done, we check they are.
£1,000
For when you need to see behind the finishes
Everything in the standard inspection, plus we open things up.
Our standard inspection is non-intrusive: we look, test and measure, but we don’t remove fixed parts or lift floors. The intrusive inspection is for buyers who want that done, and every part we remove is put back.
Fully independent
No developer referrals. We only work for you.
Trade qualified
Qualified electrician, working on new-build sites every week.
CSCS carded
Cleared to inspect on live sites before you complete.
Fully insured
Public liability and professional indemnity cover.
The short answers. There are more on the FAQs page.
Yes. Under the New Homes Quality Code, developers must give you the chance to have a pre-completion inspection once the home is finished. We carry CSCS cards, so we can attend on a live site. Tell us your completion date and we will arrange access.
No. A snagging inspection is a detailed check of the finish and workmanship against the standards the developer has signed up to. It is not a structural survey, a valuation or a RICS HomeBuyer report. If you want structural advice, we will tell you and point you to a surveyor.
That is between you and the developer, and we don’t get in the middle of it. What we do is give you a report so clear they can’t argue with it, and, if you want, come back once they say the work is done to check it really is.
No. Many buyers leave us to it and get the call afterwards. If you would like to walk round with us at the end, we are happy to.
Not on a standard inspection. It is non-intrusive: we don’t remove fixed parts, lift floors or open sealed units. If you want us to, book the intrusive inspection and we will open up the accessible areas and put everything back.
A note from Rich on one week, one plot, and a snag list that had been signed off with the insulation still on the landing.
Two years sounds like a long time. It goes quickly. What is covered, what is not, and why month 21 is the date to put in your diary.
They sound similar and they are not. What each one checks, who does it, and when a new-build buyer needs which.
Tell us the plot and the date. We will confirm a slot the same day.