Why the two-year mark matters

For the first two years the developer must fix defects in workmanship and materials. From year three, the warranty provider only covers major structural failure. Anything the house has developed in two years of settling, drying out and being lived in, from cracked grout to dropped doors to a patio that has sunk, becomes your cost the day the period ends.

What we do

The full inspection, with particular attention to the things that show up late: movement and shrinkage cracks, sealant and grout failure, drainage and guttering, external ground levels, roof coverings and flashings, and any repair the developer made in year one. We put it all in a report dated inside your defects period, so it is on the record before the deadline.

Timing

Book for month 21 or 22. That leaves time for the report to reach the developer and for the work to be logged before month 24. Check your completion date and your warranty certificate, and if you are not sure, ask us.

  • Fully independent

    No developer referrals. We only work for you.

  • Trade qualified

    Qualified electrician, working on new-build sites every week.

  • CSCS carded

    Cleared to inspect on live sites before you complete.

  • Fully insured

    Public liability and professional indemnity cover.

Coming up to two years?

Check your completion date and get it booked.

Call us Book an inspection